Free radiant-floor tubing calculator. Tube in the floor = area × 12 / spacing in inches. Loops fit inside the maximum length after both leaders. Runs in your browser; not a permit.
Estimate only. Use the adopted mechanical code, nameplate curves and a licensed designer. Not Manual J, not a listed hood, not electrical sizing.
Ranking radiant-floor calculators turn heated area and tube spacing into length with 12 divided by the spacing in inches. 9 in spacing is 1.33 ft of tube per ft². They then split the floor so each loop, including the supply and return leaders back to the manifold, stays inside a maximum. 300 ft is the planning cap they print for 1/2 in PEX; 250 ft and 400 ft are the neighbouring caps for smaller and larger tube. Water flow, when a load is typed, is BTU/h ÷ (500 × ΔT).
Not a floor heat-loss and not a slab thickness. Spacing does not by itself set the BTU/h.
The GPM page is flow from load and ΔT. This page is how much tube and how many loops.
Related calculators on this site:
Type heated area, spacing, one-way leader and the maximum loop. Optional: zone BTU/h and ΔT for GPM. Example is 200 ft², 9 in, 10 ft leader, 300 ft max, 8,000 BTU/h, 20 °F.
Area ft², spacing inches, leader ft one way, max loop ft, optional BTU/h and ΔT.
Values update in this browser as you type. Use Example for the same numbers as the worked section. Copy puts the result on the clipboard. Next links reuse the last CFM, ACH and temperatures you typed on this device.
L = A × 12 / spacing;
Area, spacing and the maximum must be positive. Both leaders have to fit inside the maximum or the loop cannot be built. No splice inside the floor.
Inch-pound identities (CFM, ft, in. w.g., BTU/h, GPM) are the US HVAC default. SI chips use m³/h or L/s, metres, Pa, kW and L/s. 1 CFM ≈ 1.699 m³/h ≈ 0.472 L/s. 1 in. w.g. ≈ 249 Pa. Air density 0.075 lb/ft³ and the 1.08 / 0.68 / 500 / 24 factors assume near-standard air or water unless you override them.
Typical uses include:
1) 200 ft² at 9 in, one loop under 300 ft.
2) 6 in spacing where the load is high.
3) 12 in spacing on a low-load slab.
None of these sketches replace a licensed mechanical engineer, a Manual J/D/S, a listed-hood submittal, or the mechanical code adopted on the job. Cleanrooms, health-care, and fire/smoke exhaust need those specifications.
The Example button uses this set:
200 × 12 / 9 = 266.7 ft in the floor
Usable length 300 − 20 = 280 ft, so 1 loop. Order 266.7 + 20 = 286.7 ft. 8,000 / (500 × 20) = 0.8 GPM.
Feet of tube per square foot. 9 in spacing is 1.33 ft/ft². 200 × 12/9 = 267 ft in the floor.
The planning cap those pages use for 1/2 in PEX, leaders included. 3/8 in is often near 250 ft, 5/8 in near 400 ft. Type the maker’s limit.
Supply and return from the manifold. Two 10 ft leaders use 20 ft of the 300 ft budget and are added to the order.
Pressure drop. The page splits the floor so the tube in the floor fits in the maximum after both leaders.
6 in is the high-load spacing, 2 ft of tube per ft². 12 in is 1 ft per ft². Heat output comes from water temperature and the floor, not from this length alone.
Load ÷ (500 × ΔT). 8,000 BTU/h and 20 °F is 0.8 GPM for the zone.
Composite of ranking radiant-loop calculators. 12 / spacing is the shared length rule. 300 ft including leaders is the 1/2 in planning cap those pages print. 500 × ΔT is the same water identity as the GPM page.
Estimate only for tubing quantity. The tube maker’s pressure-drop limit and the floor assembly set the real maximum and the real spacing.
Results are estimates computed on your device. Nameplate curves, TAB measurements, and the authority having jurisdiction control the installation. This site does not size refrigerant charge, fire dampers, medical gas, or electrical conductors.