Hydronic GPM, pipe and tower calculators
500×GPM×ΔT, pipe velocity, pump head, expansion tank, tower makeup.
500×GPM×ΔT, pipe velocity, pump head, expansion tank, tower makeup.
These tools convert hydronic load to GPM with 500 × GPM × ΔT, sketch pipe velocity, pump head, expansion-tank volume, boiler size and cooling-tower makeup.
They are not a pipe-stress model, not a glycol property table, and not a tower selection from a manufacturer. Refrigerant piping is out of scope.
Open GPM-BTU when you have BTU/h and ΔT. Open hydronic-pipe for velocity × area. Open pump-head for elevation + friction + fittings. Open expansion-tank for water volume and ΔT.
Use 20 °F ΔT as a teaching default only if the plant actually runs that. Glycol changes both 500 and freeze margin.
BTU/h = 500 × GPM × ΔT (water, IP). SI: kW ≈ 4.18 × L/s × ΔT(K). Head sketches add static lift and a Darcy friction term. Tower makeup splits evaporation and blowdown.
Inch-pound identities (CFM, ft, in. w.g., BTU/h, GPM) are the US HVAC default. SI chips use m³/h or L/s, metres, Pa, kW and L/s. 1 CFM ≈ 1.699 m³/h ≈ 0.472 L/s. 1 in. w.g. ≈ 249 Pa. Air density 0.075 lb/ft³ and the 1.08 / 0.68 / 500 / 24 factors assume near-standard air or water unless you override them.
Use this group when the loop is water. Use heat tools for air-side 1.08. Use chiller-tonnage if you already think in tons.
None of these sketches replace a licensed mechanical engineer, a Manual J/D/S, a listed-hood submittal, or the mechanical code adopted on the job. Cleanrooms, health-care, and fire/smoke exhaust need those specifications.
100,000 BTU/h at 20 °F ΔT → GPM = 100000 / (500 × 20) = 10 GPM.
10 GPM in 1 in copper is a high velocity talk — check hydronic-pipe before you accept the noise.
500 ≈ 8.34 lb/gal × 60 min/h × 1 BTU/lb·°F for water. Glycol is not 500.
A common hydronic band is 2–5 ft/s in small mains. Open the pipe page.
Closed loops do not lift the static height both ways. Friction and fittings still add.
From system volume and temperature range, not a boiler kW chip.
Evaporation plus blowdown from cycles of concentration — a sketch.
A load chip, not a combustion-air or vent design.
Water-side sketches. Fluid properties, NPSH and the plant sequence prevail.
Results are estimates computed on your device. Nameplate curves, TAB measurements, and the authority having jurisdiction control the installation. This site does not size combustion air, refrigerant charge, fire dampers, medical gas, or electrical conductors.