ASHRAE 62.1 sizes breathing-zone outdoor air as V_bz = Rp × Pz + Ra × Az. Rp is CFM per person, Ra is CFM per square foot, Pz is zone population, Az is zone floor area. An office teaching chip of Rp = 5 and Ra = 0.06 on 10 people and 1,000 ft² is 5 × 10 + 0.06 × 1000 = 50 + 60 = 110 CFM outdoor air. The standard’s occupancy categories and the Ez effectiveness factor are in the licensed document. This site does not reprint Table 6-1.

Classroom talk often uses a higher Rp (the tool’s class chip is 10 CFM/person as a discussion value you can edit). Retail, gym and swimming-pool occupancies are different rows. If you type office Rp on a lecture hall you will under-ventilate people and over-trust the area term.

How to use it

Open 62.1 outdoor air. Enter people, area, Rp and Ra. The office and classroom chips only fill Rp; set Ra from your licensed row. Then remember: this CFM is outdoor air, which may be a fraction of supply CFM. Supply CFM for mixing still comes from ACH, from a load, or from 400 CFM/ton — different pages.

Indoor pools are not this occupancy row. Pool outdoor-air talk on this site is a CFM/ft² of water sketch on indoor pool.

Worked numbers

Classroom 30 students, 900 ft², Rp 10, Ra 0.12: 300 + 108 = 408 CFM OA. If the air handler supplies 1,200 CFM, outdoor-air fraction is 408/1200 = 34%. Mixed-air temperature then belongs on mixed air.

FAQ

Is 5 CFM/person a law?

No. It is a common office discussion chip. Use the adopted 62.1 table for the occupancy.

What is Ez?

Zone air distribution effectiveness. This calculator stops at V_bz. V_oz = V_bz / Ez is the next line in the standard.

Demand control?

CO2 DCV can reduce average OA. Minimums still apply. Not modeled here.

62.1 versus 62.2?

62.1 is occupancies (offices, schools). 62.2 is dwellings. Do not mix the forms.

People unknown?

Use the occupant density from the licensed table, not a guess of zero people.

Limits

Not a smoking-room, laboratory, or healthcare 170 calculation.

Estimates only. Adopted mechanical code, nameplate curves, TAB readings and a licensed designer prevail. This is not Manual J, not a listed-hood submittal, and not a permit drawing.